Manufacturer & Exporter since 1987 Zibo, Shandong, China

Quality & Infrastructure

Eight thousand square feet, one inspection routine, and a simple rule: nothing leaves the building unmeasured.

Our approach

Quality is a routine, not a certificate on the wall.

Every batch of crosses and bearings moves through the same checkpoints: incoming material, in-process dimensions, assembly, and a final inspection before packing. Results are recorded against the heat number so a query six months later still has an answer.

Half the returned parts we examine fail on fitment, not manufacture — a dry bore, an off-square press or the wrong preload. The mounting and lubrication procedure we hand to fitters covers that sequence in the order it should happen.

  • Material grade and hardness verified on receipt
  • First-off approval before a batch runs
  • In-process sampling through the shift
  • Final inspection and batch stamping
  • Retained samples kept for traceability
Inspection laboratory
Inspection

What we measure with.

Simple, calibrated instruments used consistently beat a laboratory used occasionally.

Digital micrometer & caliper

Bore, OD and width measured on every batch.

Hardness tester

Rockwell checks on raceways and cross journals.

Roundness & runout gauges

Concentricity and runout held inside OEM limits.

Noise & rotation rig

Assembled bearings run and listened to before packing.

Surface finish comparator

Raceway finish verified against the standard sample.

Go / no-go gauges

Fast 100% checking on high-volume series.

Production floor
Infrastructure

8,000 sq ft in the heart of Zibo's bearing district.

Our Boshan premises combine production, assembly, inspection and dispatch. Being inside Asia's busiest automotive parts market means stock parts move the same day — and a missing size can often be sourced locally within hours.

8,000
sq ft premises
11–25
skilled staff
1,500+
series produced
7
export regions
Packing & dispatch

Packed for the sea, not just for the shelf.

Anti-rust first

Vapour-phase paper and oil film on machined surfaces, then individual box.

Carton & pallet

Five-ply export cartons, strapped and shrink-wrapped pallets with edge protection.

Documents handled

Invoice, packing list, certificate of origin and test reports prepared in-house.

For fitters and buyers

What to read before the first fitment.

Three references we keep coming back to — one on mounting and grease, one on ceramic and hybrid ball sets, and a running archive of failure notes written for maintenance teams rather than catalogues.

Get in touch

Ask for a test report with your quote.

Tell us which characteristics matter for your application and we will include the relevant inspection data with the quotation.

  • Quotation within one business day, FOB / CIF options
  • Samples and cross-reference support for obsolete part numbers
  • Private label packing under PALI®, MTM® or your own brand
+86 13230715973 [email protected]

Request a quote

Share your part number or drawing — we reply within one business day.

By sending an enquiry you agree to be contacted about your requirement. We never share your details.